Plant Replacements
We have carried out numerous plant replacements in "live" operating buildings over the years, both for existing maintenance clients and otherwise.
We have all of the resources, expertise and experience required to replace major items of plant whilst ensuring a smooth changeover without any disruption to the normal operation of the building.
The following are examples of some plant replacement projects we have recently completed:
Close
La Touche House
IFSC
Contract Value: approx €135,000
Project description:
Chiller Replacement Project
- De-Commissioning of existing roof mounted chiller
- Obtaining a permit from Dublin City Council to accommodate the crane lift
- Removal of existing chiller and positioning of new chiller on the roof using a mobile crane
- Disposing old chiller and R22 gas in accordance with regulations
- Installation and commissioning of new chiller
The entire project was carried out over a weekend without any disruption to the normal operation of the building.
The old chiller was shut down on Friday 21st January 2011 and the new chiller was operational on Monday 24th January 2011.
Close
Guild House
IFSC
Contract Value: approx €120,000
Project description:
Chiller Replacement Project
- De-Commissioning of existing roof mounted chiller
- Removal of existing chiller and positioning of new chiller on the roof using a mobile crane
- Disposing old chiller and R22 gas in accordance with regulations
- Installation and commissioning of new chiller
The entire project was carried out over a weekend without any disruption to the normal operation of the building.
The old chiller was shut down on Friday 4th June 2010 and the new chiller was operational on Monday 7th June 2010.
Close
Nutgrove Shopping Centre
Dundrum
Contract Value: approx €50,000
Project description:
Boiler Replacement
- Disconnection & removal of existing Cast Iron Buderus Lollar Boilers and Reillo RS 38 Burners
- Supply and installation of 2no. new high efficiency condensing Rendamax R604 Gas Fired Condensing Boilers
- Installation of 2no. new flues from the boilers to roof level
- Installation of new pipework, boiler pumps, non-return valves, de-aerators, manometers and safety valves and connection to the existing LPHW flow and return headers
- Commissioning of the new boilers
Close
DIT
Cathal Brugha Street
Contract Value: approx €100,000
Project description:
Boiler Replacement
- Strip out and removal from site of 2no. existing boilers
- Installation of 2no. new boilers
- All pipework alterations to accommodate the new installation
- Commissioning of the new installation
This project was carried out over the summer shutdown period in 2008.
Close
Jones Lang Lasalle
Molesworth Street
Contract Value: approx €85,000
Project description:
Air Handling Unit Replacement
- Strip out and removal from site of existing air handling unit, LPHW pump set and MCC panel
- Installation of a new air handling unit, LPHW pump set and MCC panel
- All pipework and ductwork alterations to accommodate the new installation
- Commissioning of the new installation
The entire project was carried out over a weekend without any disruption to the normal operation of the building.
Close
VHI
Abbey Street
Contract Value: approx €150,000
Project description:
Chiller Replacement Project
- De-Commissioning of 2no. existing roof mounted chiller & associated pumps
- Implementing and carrying out a traffic management plan to accommodate the crane lifts
- Removal of existing chillers and pumps using a mobile crane
- Disposing old equipment and R22 gas in accordance with regulations
- Lifting of new chillers, pumps and pre-fabricated pipework onto roof using a mobile crane
- Installation and commissioning of new chiller
The changeover was carried out over Easter weekend 2009 without any disruption to the normal operation of the building.
We pre-fabriacted most of the pipework installation prior to the changeover weekend to ensure the new installation could be completed in time.
Close
IFSC House
IFSC
Contract Value: approx €110,000
Project description:
Chiller Replacement Project
- De-Commissioning of existing roof mounted chiller
- Removal of existing chiller and positioning of new chiller on the roof using a mobile crane
- Disposing old chiller and R22 gas in accordance with regulations
- Installation and commissioning of new chiller
The entire project was carried out over a weekend without any disruption to the normal operation of the building.
The old chiller was shut down on Friday 22nd May 2009 and the new chiller was operational on Monday 25th May 2009.
Close
St. Stephens Court
St. Stephens Green
Contract Value: approx €60,000
Project description:
Replacement of Water Storage Tanks
- Replacement of 2no. 18,000 litre primary storage tanks
- Replacement of 1no. 9,000 litre primary storage tank
The project was strategically planned and carried out on a phased basis to ensure that there was no loss of water supply to the building.
Close
JP MORGAN
IFSC
Contract Value: approx €150,000
Project description:
Chiller Replacement Project
- Replacement of power supply cables from basement switchroom to chiller
- De-Commissioning of existing roof mounted chiller
- Implementing and carrying out a traffic management plan to accommodate the chiller delivery
- Removal of existing chiller and positioning of new chiller on the roof using a mobile crane
- Disposing old chiller and R22 gas in accordance with regulations
- Installation and commissioning of new chiller, and upgrading of the BMS Controls System
This project presented major logistical challenges due to the LUAS roadworks being carried out in the area and required a high degree of management and close co-ordination with all stakeholders. The entire project took 3 weeks to complete, however the chiller changeover was done over the June Bank Holiday Weekend 2009 without any disruption to the normal operation of the building.
Close
Easons
Patrick Street, Cork
Contract Value: approx €35,000
Project description:
Chiller Replacement Project
- De-Commissioning of existing roof mounted chiller
- Obtaining a road closure from Cork City Council to accommodate the crane lift
- Removal of existing chiller and positioning of new chiller on the roof using a mobile crane
- Disposing old chiller and R22 gas in accordance with regulations
- Installation and commissioning of new chiller
Close
ACC Bank
Dublin
Contract Value: approx €100,000
Project description:
Boiler Replacement
- Disconnection & removal of existing Atmospheric Gas Boilers.
- Supply and installation of 9no. new high efficiency condensing Remeha Quinta 115 Gas Fired Condensing Boilers.
- Installation of 9no. new flues from the boilers to roof level.
- Installation of new pipework, valves, boiler pumps & low loss headers and connection to the existing LPHW flow and return headers.
- Commissioning of the new boilers.
This work was carried out during the heating season in November 2009. We carried out the work on a phased basis with certain elements done outside of normal working hours to ensure there was no loss of heat to the building throughout the installation.
La Touche House
IFSC
Projct Description:
Chiller Replacement Project
Read more
Guild House
IFSC
Projct Description:
Chiller Replacement Project
Read more
Nutgrove Shopping Centre
Dundrum
Projct Description:
Boiler Replacement
Read more
DIT
Cathal Brugha Street
Projct Description:
Boiler Replacement
Read more
Jones Lang Lasalle
Molesworth Street
Projct Description:
Air Handling Unit Replacement
Read more
VHI
Abbey Street
Projct Description:
Chiller Replacement Project
Read more
IFSC House
IFSC
Projct Description:
Chiller Replacement Project
Read more
St. Stephens Court
St. Stephens Green
Projct Description:
Replacement of Water Storage Tanks
Read more
JP MORGAN
IFSC
Projct Description:
Chiller Replacement Project
Read more
Easons
Patrick Street, Cork
Projct Description:
Chiller Replacement Project
Read more
ACC Bank
Dublin
Projct Description:
Boiler Replacement